Westgate (Slide 1 of 1)

Westgate Leisure Centre, Chichester

Chichester District Council appointed Pope Consulting Ltd to undertake the design and project management of new plant at the Westgate Leisure Centre in Chichester. The existing single boiler plant had no redundancy when the CHP plant failed and we designed and tendered the installation of two new 395kW fuly modulating condensing gas boilers, linked into the Centre's energy loop. The Centre's domestic hot water was also upgraded. We subsequently drafted tender documentation for the replacement of the Centre's combined heat and power (CHP) installations and advised on tender evaluation.